This site uses cookies. Some of the cookies we use are essential for parts of the site to operate and have already been set. You may delete and block all cookies from this site, but parts of the site will not work.

 
DATA COOLING gallery header image

Browse our Data Cooling Showcase

 

CASE STUDIES  - UK 

 

Google, Victoria – Office Refurbishment, 1 floor

 

Bank of England – Office Refurbishment, Plant Rooms

 

Bank of America – New office air conditioning installation

 

Bank of China – New office air conditioning installation 

 

St George’s Hospital, Tooting – Office Refurbishment and new laboratory installation, Chiller replacement

 

Canary Wharf Tower, London – General services i.e. drainage, air conditioning 

 

Orange, Park Royal – Data Centre

1750 square meter North London warehouse was converted into a data centre.  The conversion took place over a number of phases.  Phase 1 consisted of

 

  • Mains switchroom
  • Loading bay with roller doors and scissor lift 
  • Pumps control gear and pipework for the dry coolers and air conditioning units 
  • 2 x 200kVA UPS units and external 800kVA generator
  • Air aspiration and Hi-fog fire suppression

 

Further phases increased the size of the Comms area including further UPS units and a new 1000kVA generator. 

 

Telecity, Harbour Exchange, London – Data Centre

One of the first major hosting data centres to be built in London.  We provided all the cooling requirements to pumps, dry coolers and 80 Airdale CRAC units 

 

Telecity, Bonnington House – Data Centre 

 

Global Switch, 7th Floor – Data Room

Major refurbishment of data room for Fujitsu

 

Equinix Park, Park Royal (formerly known as IX Europe Ltd) – Data Centre

Telehosting facility in Heathrow, West London

The site comprises of a 3000 square meter Ground Floor area divided into reception, canteen, toilet/shower facilities, control, mains power and UPOS room with Comms Areas divided into client suites and co-location areas.  

 

Interxion, Old Truman’s Brewery – Data Centre

Rooftop work construction began for  a new chilled water pump house and we installed four 750kw free cooling Uniflair Chillers serving 33 CRAC Units.  

 

Further construction has continued of chilled water pipework to 4 floors of new Data Suites, 5 new chillers and all associated pipework and still continues today.

 

Hillingdon Borough Council Offices – Data Room in partnership with APC

  

Blackpool Borough Council Offices – Data Room

We built a Data Room for the council in partnership with APC

 

Ministry of Defence – Data Rooms, Plant Rooms

 

Department of Education – Data Room

A Data Room was required which we built in partnership with APC



 

EUROPE  

IX Europe, Equinox – Data Centre

Dusseldorf, Germany

 

IX Europe – Data Centre

Paris

Conversion of existing warehouse into a telehosting facility in Paris.   This included the installation of 3 x 2mVA generators and 5 x 500kVW UPS and Glycol free cooling, steelwork for a full mezzanine level, refurbishment of offices and reception area with comfort cooling.

 

Zurich – ABB Silicone Chip Factory – Plant Rooms 

Switzerland